Social Housing Construction Status Report Q4 2022HousingThe latest Construction Status Report shows that 6,525 social homes were onsite at the end of 2022, with an additional 12,733 homes at design and tender stage. In Quarter 4 2022, 147 new construction schemes, (713 homes) were added to the pipeline. In total the Construction...