Social Housing Construction Status Report Q1 2023

The latest Construction Status Report shows that 8,005 social homes were onsite at the end of Quarter 1 2023 with an additional 13,269 homes at design and tender stage. In Quarter 1 2023, 121 new construction schemes, (1,564 homes) were added to the pipeline.

  • Go to resource

Resource: Q1 2023 CSR

URL: https://opendata.housing.gov.ie/dataset/5fd72100-0107-4288-aa62-575bd8d308bf/resource/f3981554-6298-495d-af7a-bd17e3641713/download/csr-q1-2023-final.xlsx

There are no views created for this resource yet.

Additional Information

Field Value
Data last updated 22 September 2023
Metadata last updated 24 October 2023
Created 22 September 2023
Format XLXS
License Creative Commons Attribution Share-Alike 4.0
Idf3981554-6298-495d-af7a-bd17e3641713
Mimetypeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
NotesThe Social Housing Construction Status Report (CSR) provides a breakdown of local authority and approved housing body social housing new-build activity. The Report includes scheme level details on the completion of social housing new builds, as well as information on each construction scheme as it progresses through the design and tender processes.
Package id5fd72100-0107-4288-aa62-575bd8d308bf
Position1
Size156.5 KiB
Stateactive
Description The Social Housing Construction Status Report (CSR) provides a breakdown of local authority and approved housing body social housing new-build activity. The Report includes scheme level details on the completion of social housing new builds, as well as information on each construction scheme as it progresses through the design and tender processes.
High Value Dataset (HVD) Resource