Social Housing Construction Status Report Q3 2023

Téama: Housing
Tuairimí: 429
Rátáil oscailteachta:

The latest Construction Status Report shows that 9,782 social homes are currently onsite with an additional 13,822 homes at design and tender stage. In Quarter 3 2023, 160 new construction schemes (2,146 homes) were added to the pipeline.

  • Íoslódáil

Resource: Q3 2023 CSR

URL https://opendata.housing.gov.ie/dataset/f1c66579-c9fa-4a9f-aa97-ad5c8bfe7dbd/resource/96eb7b00-a4cf-4a50-9ea1-82cd13c6530a/download/social-housing-construction-status-report-q3-2023-.csv

This resource view is not available at the moment. Click here for more information.

Download resource

Data Dictionary

Column Cineál Label Cur síos
no_ numeric No.
Funding Programme text Funding Programme
LA text LA
scheme_project_name text Scheme/Project Name
no__of_units numeric No. of Units
Approved Housing Body text Approved Housing Body
Stage 1 Capital Appraisal text Stage 1 Capital Appraisal
Stage 2 Pre Planning text Stage 2 Pre Planning
Stage 3 Pre Tender design text Stage 3 Pre Tender design
stage_4_tender_report_or_final_turnkey_calf_approval text Stage 4 Tender Report or Final Turnkey/CALF approval
On Site text On Site
Completed text Completed

Additional Information

Field Value
Data last updated 13 Nollaig 2023
Metadata last updated 4 Aibreán 2024
Created 13 Nollaig 2023
Formáid CSV
Ceadúna Creative Commons Attribution Share-Alike 4.0
Datastore activeTrue
Has viewsTrue
Hash2cf5898d5e944db5b6006351c23cdbda
Id96eb7b00-a4cf-4a50-9ea1-82cd13c6530a
Mimetypetext/csv
NotesThe latest Construction Status Report shows that 9,782 social homes are currently onsite with an additional 13,822 homes at design and tender stage. In Quarter 3 2023, 160 new construction schemes (2,146 homes) were added to the pipeline.
Package idf1c66579-c9fa-4a9f-aa97-ad5c8bfe7dbd
PreviewTrue
Preview rows2,826
Size323.7 KiB
Stateactive
Total record count2,826
Cur síos The latest Construction Status Report shows that 9,782 social homes are currently onsite with an additional 13,822 homes at design and tender stage. In Quarter 3 2023, 160 new construction schemes (2,146 homes) were added to the pipeline.
High Value Dataset (HVD) Resource
Applicable Legislation
Formáidí freagartha API
    Cineál API
    Url Rochtana API