Social Housing Construction Status Report Q3 2024

Téama: Housing
Tuairimí: 54
Rátáil oscailteachta:

The latest Construction Status Report shows that 12,492 social homes are currently onsite with an additional 15,750 homes at design and tender stage, giving a total of 28,242 homes at all stages of design and build. In Quarter 3 2024, 124 new construction schemes (1,921 homes) were added to the pipeline.

  • Go to resource

Resource: CSR Q3 2024

URL https://opendata.housing.gov.ie/dataset/f4112062-37fb-4396-b507-4ea2b80ec60d/resource/00d660f9-f0d7-4b17-8880-cf0bcc65f4c3/download/csr-q3-2024.csv

There are no views created for this resource yet.

Data Dictionary

Column Cineál Label Cur síos

Additional Information

Field Value
Data last updated 14 Eanáir 2025
Metadata last updated 14 Eanáir 2025
Created 14 Eanáir 2025
Formáid CSV
Ceadúna Creative Commons Attribution Share-Alike 4.0
Datastore activeTrue
Hash70c7f486ebff732f0aeb682fcb3259a3
Id00d660f9-f0d7-4b17-8880-cf0bcc65f4c3
Mimetypetext/csv
NotesThe latest Construction Status Report shows that 12,492 social homes are currently onsite with an additional 15,750 homes at design and tender stage, giving a total of 28,242 homes at all stages of design and build. In Quarter 3 2024, 124 new construction schemes (1,921 homes) were added to the pipeline.
Package idf4112062-37fb-4396-b507-4ea2b80ec60d
PreviewTrue
Preview rows2,906
Size327.5 KiB
Stateactive
Total record count2,906
Cur síos The latest Construction Status Report shows that 12,492 social homes are currently onsite with an additional 15,750 homes at design and tender stage, giving a total of 28,242 homes at all stages of design and build. In Quarter 3 2024, 124 new construction schemes (1,921 homes) were added to the pipeline.
High Value Dataset (HVD) Resource
Applicable Legislation
    Formáidí freagartha API
      Cineál API
      Url Rochtana API