The latest Construction Status Report shows that 12,492 social homes are currently onsite with an additional 15,750 homes at design and tender stage, giving a total of 28,242 homes at all stages of design and build. In Quarter 3 2024, 124 new construction schemes (1,921 homes) were added to the pipeline.

  • Íoslódáil

Resource: CSR Q3 2024

URL https://opendata.housing.gov.ie/dataset/f4112062-37fb-4396-b507-4ea2b80ec60d/resource/421d721a-f3d3-413f-b432-16634b70349b/download/csr-q3-2024.xlsx

Data Dictionary

Column Cineál Label Cur síos

Additional Information

Field Value
Data last updated 14 Eanáir 2025
Metadata last updated 14 Eanáir 2025
Created 14 Eanáir 2025
Formáid XLSX
Ceadúna Creative Commons Attribution Share-Alike 4.0
Datastore activeTrue
Has viewsTrue
Hash67d88e66c0153bdb6b4629a6bc47d662
Id421d721a-f3d3-413f-b432-16634b70349b
Mimetypeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
NotesThe latest Construction Status Report shows that 12,492 social homes are currently onsite with an additional 15,750 homes at design and tender stage, giving a total of 28,242 homes at all stages of design and build. In Quarter 3 2024, 124 new construction schemes (1,921 homes) were added to the pipeline.
Package idf4112062-37fb-4396-b507-4ea2b80ec60d
Position1
PreviewTrue
Preview rows2,906
Size224.5 KiB
Stateactive
Total record count2,906
Cur síos The latest Construction Status Report shows that 12,492 social homes are currently onsite with an additional 15,750 homes at design and tender stage, giving a total of 28,242 homes at all stages of design and build. In Quarter 3 2024, 124 new construction schemes (1,921 homes) were added to the pipeline.