-
Seabird Monitoring undertaken during the Blue Whiting Acoustic Survey (BWAS) 2021TimpeallachtThe purpose of this project was to count seabird species occurring in Irish waters. A standard line transect survey methodology was employed by the seabird observer with additional visual point sampling at fishing locations and oceanographic sampling stations during the Blue...
-
TimpeallachtThe Grassland Monitoring Project 2006 represents the initial phase of a larger grassland survey which is designed to meet the monitoring and conservation objectives of the Habitats Directive. The Grassland Monitoring Project 2006 is initially focusing on the two priority...
-
Habitat and management data collation and collection on callows and floodplain grasslandsTimpeallachtThe project was organised into two distinct stages. Stage A involved the collection and collation of the habitat and management data on floodplain grasslands and was primarily a GIS task. Stage A included a review of appropriate management for callows and floodplain...
-
Small Cetacean Site Survey Investigations 2008TimpeallachtA survey of small cetaceans was carried out at three sites (Carnsore Point, Blasket Islands cSAC and Donegal bay) to derive density and abundance estimates using distance sampling. Single platform line transect surveys were carried out on three days at each between July and...
-
The monitoring and assessment of three EU Habitats Directive Annex I grassland habitatsTimpeallachtThe monitoring and assessment of three EU Habitats Directive Annex I grassland habitats, referred to as the Grassland Monitoring Survey (GMS), was a three-year survey conducted from 2015 to 2017 by BEC Consultants on behalf of NPWS. One hundred and ten EU Annex I grassland...
-
Seabird Monitoring undertaken during the Western European Shelf Pelagic Acoustic Survey (WESPAS) ...TimpeallachtUnder the EU Birds Directive, there is a requirement on member states to conduct surveillance of seabirds occurring within their waters. A standard line transect survey methodology was employed by the seabird observer with additional visual point sampling at fishing locations...
-
Seabird Monitoring undertaken during the Celtic Sea Herring Acoustic Survey (CSHAS) 2021TimpeallachtIrish waters represent one of the most important marine habitats for seabirds in Europe and are utilized by a wide range of seabird species. However, the at-sea abundance and distribution of many of the seabird species occurring in Irish waters remains poorly understood. Under...
-
Section 42 by County 2022 Licences issued & deer shotTithíocht
This dataset has no description
-
List of Derogation Licences/Applications to End of October 2023Tithíocht
This dataset has no description
-
This dataset has no description
-
The aim of the NPWS Seabird Foraging Radii Project was to create a number of polygon shapefiles describing the geographic foraging range of 20 seabird species identified by the National Parks and Wildlife Service Birds unit. The polygons were centred around Natura 2000 SPA...
-
Agreed boundary for Offshore Renewable Energy development between Ireland and Northern IrelandTimpeallachtTo facilitate the development of offshore renewable energy installations, the Government of the United Kingdom of Great Britain and Northern Ireland and the Government of Ireland defined two boundary lines between Northern Ireland and Ireland. This is to clarify...
-
National Monuments Service - World Heritage PropertiesTimpeallachtThis dataset displays locational information for the UNESCO World Heritage sites Brú na Bóinne and Sceilg Mhichíl. It also contains the buffer boundary of Brú na Bóinne. All datasets have been recorded by the National Monuments Service on behalf of UNESCO as part of their...
-
This dataset has no description
-
List of Derogation Licences/Applications to End of September 23Tithíocht
This dataset has no description
-
New House Registrations
-
This dataset has no description
-
Social Housing Construction Status Report Q1 2023TithíochtThe latest Construction Status Report shows that 8,005 social homes were onsite at the end of Quarter 1 2023 with an additional 13,269 homes at design and tender stage. In Quarter 1 2023, 121 new construction schemes, (1,564 homes) were added to the pipeline.
-
Social Housing Construction Status Report Q2 2023Tithíocht
This dataset has no description
-
List of Derogation Licences/Applications to End of August 2023Tithíocht
This dataset has no description